What aspects are included in the construction contract of new lime shaft kiln
The new lime shaft kiln construction contract is a key document to ensure the smooth progress of the project, and usually covers many important aspects.
In terms of construction details, the contract shall specify the specific parameters of lime shaft kiln construction, such as kiln body size, refractory specification and laying requirements, installation standards of combustion system and ventilation system, etc. At the same time, the construction schedule shall be specified, including the time nodes and deliverables of each stage, so as to ensure that the project is completed on schedule.
The method of payment is an essential provision of the Contract. Generally, installment payment is adopted, for example, a certain proportion of advance payment is paid after the contract is signed, which is used for purchasing materials and early preparation; The progress payment shall be made for the main structure in a certain stage; The final payment shall be paid after the project is completed and accepted. The payment ratio and time shall be clearly defined to avoid subsequent disputes.
Construction acceptance is also critical. The contract shall specify the acceptance criteria and procedures, such as kiln strength, refractory performance, equipment operation stability and other indicators to meet the specified requirements. Both parties shall participate in the acceptance, and the construction party shall rectify the non-conformance within a time limit until the acceptance is passed.
A perfect construction contract for new lime shaft kiln can effectively guarantee the rights and interests of both parties and promote the smooth implementation of the project by specifying the construction details, payment method, construction acceptance and other terms.